24th August 2012
Day 1
Today we got into the house and started work. Peter got to the house before us as started off fixing the leaking tap in the kitchen. After pulling up the laminate flooring in d/s room 2 Dave began pulling up a couple of floorboards to check out the condition of the floor beams. He gave them the OK in the second room and also the front room.
With the tap fixed we set out pulling all the laminate flooring up. We eventually got it up in all the rooms, both upstairs and downstairs. and also the kitchen.
We also started to knock through the bathrooms, pulled out the sinks, bath, toilet cistern and took off most of the tiles from the back bathroom. One long day and a load of work from everyone who helped.
Mum
Dad
Peter
Dave
Sarah and I
I wonder what we will get up to tomorrow?